Sleeter Bank Stabilization

To provide bank stability and revegetation for 200 linear feet of rapidly eroding bank on the Yaak river, Watershed Consulting performed the initial assessment, permitting, & construction of a design provided by River Design Group. & worked with River Design Group. Work included two large wood jam structures, 125' of woody brush bank, and over 500 cubic yards of large cobble to stabilize a scour hole close to 20' in depth.